摘 要:神华包头煤气化装置采用美国GE水煤浆气化工艺,7台气化炉,5开2备,是目前国内规模最大的煤气化装置。GE水煤浆气化炉为周期性运行反应炉,故其周期性检修对装置的长周期稳定运行至关重要。简述了GE水煤浆气化装置工艺流程;探讨和总结了装置各单元的检修要点。
关键词:GE水煤浆气化装置;检修要点;分析;总结
doi:10.3696/j.issn.1004-8901.2012.03.011
中图分类号:TQ545 文献标识码:A 文章编号:1004-8901(2012)03-0040-03
Briefly Analyzing Overhaul Gist for GE Water Coal Slurry Gasification Plant
YAN Guo-fu
(Baotou Coal Chemical Engineering Sub-company,China Shenhua Coal to Oil Chemical Engineering Company Ltd.,Neimenggu Baotou 014000 China)
Abstract:American GE water coal slurry gasification process was adopted in the Shenhua Baotou coal gasification plant,there were 7 pieces of gasifiers,in which the 5 was in operation and the 2 was standby,it was the largest coal gasification plant in the operation scale at home presently. GE water coal slurry gasifier was the periodically operating reaction furnace,so i....